Download a PDF of our Performance Planning Brochure
The One Page Planning and Performance System Sample Plan Product Development Plan Develop economically viable solution to 6782 printer memory error problem by 12/1/02. Reduce the incidence of printer fatal error messages. Achieve .0000032 per thousand memory errors per average test cycle by 9/1/02. Keep cost of upgrade to $1.53 per shipped unit. Operate within budget of $356,000.00. Use 3 teams of 2 engineers plus 2 outside consultants. Concentrate on fixing current design rather that replacing it with another. Hold weekly progress meeting with team to review progress against plan/budget. Use outside consultants on as needed basis for new laser technologies. Establish teams by 3/1. Identify and qualify 2 outside consultants; finalize contracts by 3/1. Complete problem assessment by 5/31. Propose an engineering solution by 6/30. Complete prototypes by 7/31. Complete product trials by 8/30. Document final product specs by 9/30. Complete installation of modified production equipment by 11/30. NOTE: This plan is a static sample. To see performance scorecards and progress reports go to the System Tour Finish Tour
The One Page Planning and Performance System